Articles
Rider-Ericsson Hot Air Engine Kit Build Part 2

After a necessary break from the engine of about six months due to work commitments, I finally got back into the workshops and back to work on the Rider.

It was at this point that I decided that before I bolted the cylinder and flywheel bracket together, that it would be best to make the walking beam and saddle that it sat in first.

Subscribe to The Old Machinery Magazine to read the full story.